
Know what to charge before you quote.Pricing calculators for contractors, trades and small shops
Calculators for 40 trades. Put in what your business really costs, and every quote covers your wages, your overhead and a profit. Excel and Google Sheets.
Find your tradeWork out your hourly rate, free
- 40 trade-specific calculators
- Excel and Google Sheets
- Instant download
- Materials, with 5% waste and markup$698
- Labour: 30.5 hours at your real rate of $69.95$2,288
- Permit, travel, supply runs, second inspection$1,100
- Safety cushion and profit$1,008

One calculator. Everything you need to price the job.
Put in what your business costs once. Every quote is built from those numbers, and after the job the Job Log shows how close your estimate was, so the next price is even better. All in one spreadsheet you already know how to use.
1. Set up your costs
Once a year
- Rent, insurance and vehicles
- Your crew, and your own pay
- Equipment and tools
- What you pay for materials
Your real hourly rate
$69.95
2. Create and send the quote
Every job
- Materials
- $698
- Labour
- $2,288
- Permit and travel
- $1,100
- Cushion and profit
- $1,008
Price before tax
$5,094
Sent to the customer as a PDF.
3. Check your estimates
After the job, in the Job Log
- R. Patel19% overQuoted 26 hrs, took 31
- Greenview Condos6% overQuoted 8 hrs, took 8.5
- D. Chen71% overQuoted 14 hrs, took 24
Next time, quote it right.
Built for the way your trade actually works.
40 calculators, each set up for one trade: its own costs, its own easy-to-miss list, and a filled-in example job.
PlumbingFixtures, rough-in, permits and supply runs
Concrete & FlatworkYards, tear-out, base, forms and finish
Electrical ContractorPanels, wire, permits and inspections
Painting ContractorWalls, trim, coats, prep and cleanup
HVAC InstallEquipment, install stages and warranty
RoofingSquares, tear-off, crew hours and waste
Lawn CareMinutes per stop, frequency and season
House CleaningRooms, frequency, supplies and drive
Being busy doesn't mean you're making money.
It's easy to miss a cost: a supply run, extra materials, the permit, or your overhead. Each one is small. Together they eat the profit you thought you made.
- Materials
- −$1,140
- Labour
- −$1,520
- What you thought was profit
- $1,340
- Overhead you forgot to count
- −$740
- Actual profit
- $600
Yellow, grey, green or red: you always know what happened.
- Yellow is yours
- Your overhead, your wages, your prices, the job.
- Grey is worked out
- Your real hourly rate, the cost of each part, the forgotten costs.
- Green is what you keep
- The price, the profit, and whether the finished job made money.
- Red needs a look
- A price you haven't checked in months, a cost left out, or a job that lost money.